Completed Projects

List of Executed Completed Project

SL No. PROJECT DETAILS CLIENT JOB DESCRIPTION PERIOD REMARKS
1 2 X 210 MW,TPS-1 EXPANSION,NLC INDIA LIMITED,NEYVELI NLC INDIA LIMITED NEYVELI REVAMPING, REPAIRS & STRENGTHENING OF MILL STOP DAMPERS IN TPS- I EXPN. 2022 COMPLETED
2 2 X 210 MW,TPS-1 EXPANSION,NLC INDIA LIMITED,NEYVELI NLC INDIA LIMITED NEYVELI REVAMPING / REPAIRS / STRENGTHENING OF PULVERISED FUEL DUCTS IN TPS I EXPANSION 2022 COMPLETED
3 1 x 130 TPH,CFBC BOILER,
DECCAN FINE CHEMICAL(INDIA) PVT LTD,KESAVARAM,VIZAG, ANDHRA PRADESH
DECCAN FINE CHEMICAL (INDIA) PVT LTD
HYDERABAD
FABRICATION & ERECTION OF IBR PIPING WORK IN EOU UNIT 2020 COMPLETED
4 1 x 130 TPH,CFBC BOILER, DECCAN FINE CHEMICAL(INDIA) PVT LTD,KESAVARAM,VIZAG, ANDHRA PRADESH DECCAN FINE CHEMICAL (INDIA) PVT LTD HYDERABAD FABRICATION & ERECTION OF IBR PIPING WORK IN SEZ UNIT 2020 COMPLETED
5 2 X 210 MW NEYVELI THERMAL POWER STATION -I EXPN NLC INDIA LIMITED,NEYVELI. DISMANTLING & TRANSPORTATION OF DUCT MATERIALS,INSULATION WOOL ,CLADDING MATERIAL ETC. OF COLD GAS RECIRCULATION SYSTEM IN UNITS 1 & 2 OF TPS-I EXPN. 2019-2021 COMPLETED
6 1 x 130 TPH,CFBC BOILER,
DECCAN FINE CHEMICAL(INDIA) PVT LTD,KESAVARAM,VIZAG, ANDHRA PRADESH
DECCAN FINE CHEMICAL (INDIA) PVT LTD
HYDERABAD
FABRICATION & ERECTION OF IBR PIPING WORK IN STG AREA 2019 COMPLETED
7 1 x 130 TPH,CFBC BOILER, DECCAN FINE CHEMICAL(INDIA) PVT LTD,KESAVARAM,VIZAG, ANDHRA PRADESH DECCAN FINE CHEMICAL (INDIA) PVT LTD
HYDERABAD
FABRICATION & ERECTION OF PIPE RACK STRUCTURAL WORK 2019 COMPLETED
8 1 x 130 TPH,CFBC BOILER,
DECCAN FINE CHEMICAL(INDIA) PVT LTD,KESAVARAM,VIZAG, ANDHRA
PRADESH
ISGEC HEAVY ENGINEERING LIMITED,NOIDA. ERECTION & ASSISTANCE IN COMMISSIONING OF 1 X 130 TPH CFBC BOILER 2019 COMPLETED
9 2 X 65MW CPP PROJECT,GACL -NALCO ALKALIES & PVT LTD,DAHEJ,GUJARAT THERMAX INSTRUMENTATION LIMITED,PUNE ERECTION ,TESTING & COMMISSIONING OF BOILER UNIT # 1 & INTEGRAL , NON INTEGRAL PIPING,PRESSURE PARTS FOR UNIT# 2 2019 COMPLETED
10 1 X 90 TPH OIL FIRED BOILER,AUXILIARY BOILER FOR M/s L&T MHPS BOILER PVT. LTD,GHATAMPUR, UTTAR PRADESH. ISGEC HEAVY ENGINEERING LIMITED,NOIDA. ERECTION & ASSISTANCE IN COMMISSIONING OF 1 X 90 TPH AUXILIARY BOILER 2018 COMPLETED
11 3 x 660 MW STPP- NUPPL ,GHATAMPUR, UTTAR PRADESH L& T MHP BOILERS PRIVATE LIMITED, FARIDABAD ERECTION TESTING & COMMISSIONING OF PRIMARY STRUCTURE,SECONDARY STRUCTURE PRESSURE PARTS,COAL BUNKER, COAL PIPE, AIR DUCT & REFRACTORY WORK IN UNIT # 1 & 3 BOILER 2018-2021 COMPLETED
12 2 X 500 MW NEW NEYVELI THERMAL POWER PLANT, NLC INDIA LIMITED, NEYVELI, TAMILNADU. BHEL / POWERMECH PROJECTS LIMITED, HYDERABAD ERECTION TESTING & COMMISSIONING OF PRESSURE PARTS & PIPING PACKAGE FOR BOILER UNIT # 2 2017-18 COMPLETED
13 3 X 800 MW STPP - NTPC - KUDGI, DIST- BIJAPUR, KARNATAKA. EDAC ENGINEERING LTD SPICE HOUSE 88 MOUNT ROAD CHENNAI 600032 ERECTION, TESTING & COMMISSIONING OF STRUCTURAL, PRESSURE PARTS H P PIPING FOR BOILER UNIT # 2 2014-17 COMPLETED
14 2 X 660 MW STPP , NTPC - SOLAPUR, MAHARASHTRA BGRESL /POWERMECH PROJECTS LIMITED, HYDERABAD ERECTION TESTING & COMMISSIONING OF BOILER STRUCTURAL & PRESSURE PARTS OF UNIT # 1 2014-17 COMPLETED
15 2X350 MW MEENAKSHI ENERGY (P) LTD, ANDHRA PRADESH CETHAR LIMITED, TRICHI, TN ERECTION TESTING & COMMISSIONING OF BOILER STRUCTURAL, PR PARTS , IBR - NON IBR PIPING & DUCTING 2012-16 COMPLETED
16 2 X 300 MW EMCO THERMAL POWER PROJECT, WARORA, MAHARASHTRA EVERSENDAI CONSTRUCTION PRIVATE LIMITED, CHENNAI ERECTION TESTING & COMMISSIONING OF PRESSURE PARTS & NON PRESSURE PARTS & PIPING IN BOILER UNIT # 2 2011-15 COMPLETED
17 2 x 600 MW MAHAN THERMAL POWER PROJECT, SINGRAULI, MADHYAPRADESH ESSAR PROJECTS (INDIA) LIMITED, MAHALAXMI, MUMBAI- 400034 ERECTION TESTING & COMMISSIONING STRUCTURAL, PR PARTS , COAL PIPING & DUCTING FOR UNIT # 2 BOILER 2012-15 COMPLETED
18 4 X 30 MW CAPTIVE POWER PLANT AT PARADIP, ODISHA ESSAR PROJECTS (INDIA) LIMITED, MAHALAXMI, MUMBAI- 400034 ERECTION, TESTING & COMMISSIONING OF BOILER & 2 UNITS OF ESP 2012-14 COMPLETED
19 1 X180 MW CPP, OPG POWER, GUMMIDIPONDI, CHENNAI, TAMILNADU EDAC ENGINEERING LTD SPICE HOUSE 88 MOUNT ROAD CHENNAI 600032 ERECTION OF BOILER PRESSURE PARTS, UNIT # 1 BOILER 2013 COMPLETED
20 2 X 210 MW NEYVELI THERMAL POWER STATION -I EXPN NLC INDIA LIMITED,NEYVELI. DISMANTLING & TRANSPORTATION OF DUCT MATERIALS,INSULATION WOOL ,CLADDING MATERIAL ETC. OF COLD GAS RECIRCULATION SYSTEM IN UNITS 1 & 2 OF TPS-I EXPN. 2019-2021 COMPLETED
21 600 MW ( 6 BOILERS) NEYVELI THERMAL POWER STATION -I NLC INDIA LIMITED,NEYVELI. OUTSOURCING OF MECHANICAL MAINTENANCE WORKS IN PRESSURE PARTS OF BOILER IN TPS-I 2019-2020 COMPLETED
22 600 MW ( 6 BOILERS) NEYVELI THERMAL
POWER STATION -I
NLC INDIA LIMITED,NEYVELI. OUTSOURCING OF WORKS IN BOILER AUXILIARY EQUIPMENTS OF TPS-1 2019-2020 COMPLETED
23 2 X 250 MW NEYVELI THERMAL POWER STATION -II EXPN NLC INDIA LIMITED,NEYVELI. REPLACEMENT OF COMBUSTOR ROOF WATER WALL PANELS AT UNIT-II IN TPS-II EXPN. 2018-2019 COMPLETED
24 2 X 250 MW NEYVELI THERMAL POWER STATION -II EXPN NLC INDIA LIMITED,NEYVELI. MODIFICATION WORKS IN BACK PASS HANGER TUBE UNIT - I & II BOILERS 2018-2019 COMPLETED
25 2 X 210 MW NEYVELI THERMAL POWER STATION -I EXPN NLC INDIA LIMITED,NEYVELI. BIENNIAL MAINTENANCE CONTRACT WORKS BOILER PRESSURE PARTS IN TPS-I EXPN. 2017-2019 COMPLETED
26 2 X 250 MW NEYVELI THERMAL POWER STATION -II EXPN NLC INDIA LIMITED,NEYVELI. OUTSOURCING OF MODIFICATION WORKS IN FBHE OF CFBC BOILEROF UNIT-1 & 2 IN TPS-II EXPN. 2017-2018 COMPLETED
27 2 X 250 MW NEYVELI THERMAL POWER STATION -II EXPN NLC INDIA LIMITED,NEYVELI. OUT SOURCING OF MAINTENANCE WORKS OF BOILER PRESSURE PARTSIN TPS-II EXPN. 2017-2018 COMPLETED
28 2X500 MW NEW NEYVELI THERMAL POWER PROJECT. POWER MECH PROJECTS
LIMITED, HYDERABAD.
ERECTION, TESTING & COMMISSIONING OF BOILER PRESSURE PARTS FOR UNIT -1 2016-2017 COMPLETED
29 1X600 MW AT JINDAL STPP, TAMNAR, RAIGARH, CHHATTISGARH JINDAL POWER LIMITED MINI OVERHAULING OF 600 MW BOILER UNIT-1. 2016-2017 COMPLETED
30 4X600 MW AT JINDAL STPP, TAMNAR, RAIGARH, CHHATTISGARH JINDAL POWER LIMITED AMC OF BOILER PRESSURE PARTS-1 2016-2017 COMPLETED
31 4X600 MW AT JINDAL STPP, TAMNAR, RAIGARH, CHHATTISGARH JINDAL POWER LIMITED COAL HANDLING PLANT CHUTE REPAIR 2015-2016 COMPLETED
32 1X660 MW BOLIER & AUXILIARIES, THERMAL POWER PROJECT AT OPGCL, BHEL, IB TPS, BANHARPALLI, ODISHA. EDAC ENGINEERING LTD, CHENNAI ERECTION PRESSURE PARTS PASS-1 2016-2017 COMPLETED
33 3X800 MW,STPP AT KUDGI, BIJAPUR ,
KARNATAKA.
EDAC ENGINEERING LTD,
CHENNAI
ERECTION BOILER PRESSURE PARTS PASS-1 2014-2017 COMPLETED
34 2X600 MW AT SINGARENI THERMAL POWER PLANT, PEGADAPALLI, JAIPUR MANDAL, NEAR MANCHERIAL, ADILABAD, ANDHRA PRADESH. INDWELL CONSTRUCTIONS PVT. LTD, LABOUR SUPPLY OF SKILLED, SEMI SKILLED AND UNSKILLED WORKERS, LP WELDERS FOR TRANSPORTATION, ERECTION, TESTING, COMMISSIONING OF BOILER PRESSURE PARTS PASS- 1 2014-2016 COMPLETED
35 JSW ENERGY LTD - TORANAGALLU, KARNATAKA ALSTORM INDIA OVERHAULING OF MAIN TURBAINE BODY, GENERATOR & AUXILLIARY SYSTEMS OF 4X300 MW (UNIT # 2)SHANGHAI ELECTRICAL 2015-16 COMPLETED
36 4X250 MW JINDAL POWER PLANT,RAIGARH,CHATTISGARH JINDAL POWER LIMITED EXPERT SERVICE FOR OVERHAULING OF BOILER DUCT DAMPER & GATE PASS-A AT 4X250 MW 2014-2015 COMPLETED
37 RELIANCE UTILITY POWER LTD, 4X500 TPH, DAHEJ, BHARUCH, GUJARAT. POWER MECH PROJECTS
LIMITED, HYDERABAD.
ERECTION OF STRUCTURAL & PRESSURE PARTS FOR UNIT # 3 BOILER. 2014-2015 COMPLETED
38 3X800 MW,STPP AT KUDGI, BIJAPUR , KARNATAKA. EDAC ENGINEERING LTD,
CHENNAI
ERECTION OF BOILER STRUCTURE FOR UNIT # 2 2013-2016 COMPLETED
39 SOLAPUR SUPER POWER THERMAL POWER PROJECT, SOUTH SOLAPUR, 2X660 MW, FATATEWADI, MAHARASHTRA. POWER MECH PROJECTS LIMITED, HYDERABAD. ERECTION OF MAIN STRUCTURE & AUXILUARIES FOR UNIT #1 BOILER 2013-2015 COMPLETED
40 NLC THERMAL STATION EXPANSION - 1, NEYVELI ENGENIOUS ERECTORS P LTS, CHENNAI 2X210 MW ANSALDO ITALY TURBINE, GENERATOR & ITS AUXILLIARIES OVERHAULING 2014 COMPLETED
41 1X800 MW ,OPG POWER, GUMMIDIPONDI, CHENNAI EDAC ENGINEERING LTD,
CHENNAI
ERECTION OF PRESSURE PARTS 2013-2014 COMPLETED
42 2X500 MW THERMAL POWER PROJECT AT BHEL- NTPL, TUTICORIN, TAMIL NADU EDAC ENGINEERING LTD,
CHENNAI
ERECTION ,TESTING & COMMISSIONING OF BOILER ID FANS, FD FANS, & PA FANS OF UNIT -2 2013-2014 COMPLETED
43 4X600 MW AT JPL PROJECT, TAMNAR, RAIGARH, CHHATTISGARH INDWELL CONSTRUCTIONS PVT. LTD, LABOUR SUPPLY OF SKILLED, SEMI SKILLED AND UNSKILLED WORKERS, LP WELDERS FOR TRANSPORTATION, ERECTION, TESTING, COMMISSIONING OF BOILER PRESSURE PARTS PASS- 1 2013-2014 COMPLETED
44 6X135 MW, CPP,JSPL, ANGUL EDAC ENGINEERING LTD,
CHENNAI
ERECTION OF UNIT VI POWER CYCLE PIPING 2013-2014 COMPLETED
45 NLC THERMAL STATION - 2, NEYVELI, TN ENGENIOUS ERECTORS P LTS, CHENNAI MAJOUR OVERHAULING OF FRANCOTOSE ITALY TURBINE & GENERATOR 2X210 MW AND 1X210 MW BHEL INDIA TURBINE & GENERATOR 2013 COMPLETED
46 2X600 MW MAHAN THERMAL POWER PROJECT AT BANDHORA, MP ESSAR PROJECTS,MUMBAI PREASSEMBLY, ERECTION, ALLIGMENT AND WELDING OF SKIN CASING OF BOLIER PRESSURE PARTS (PASS 1&2) OF UNIT-2 2012-2013 COMPLETED
47 2X600 MW MAHAN THERMAL POWER PROJECT AT BANDHORA, MP ESSAR PROJECTS,MUMBAI ERECTION OF SOOT BLOWER AND HS PIPING FOR BOILER UNIT #2 2012-2013 COMPLETED
  2X600 MW MAHAN THERMAL POWER PROJECT AT BANDHORA, MP ESSAR PROJECTS,MUMBAI SKY CLIMBER ASSEMBLING AND DISMANTLING AT BOLIER FURNACE FOR UNIT -1 2012-2013 COMPLETED
48 2X600 MW MAHAN THERMAL POWER PROJECT AT BANDHORA, MP ESSAR PROJECTS,MUMBAI ERECTION AND WELDING OF COAL PIPING WORK FOR UNIT #2 AT SITE BANDHORA 2012-2013 COMPLETED
49 MEENAKSHI ENERGY PVT. LTD, NELLORE DIST, ANDHRA PRADESH CETHAR LIMITED, TRICHI ERECTION OF 1165 TPH (350MW) BOILER STRUCTURAL & PR.PARTS 2011-2015 COMPLETED
50 2X600 MW MAHAN THERMAL POWER PROJECT AT BANDHORA, MP ESSAR PROJECTS,MUMBAI ERECTION OF BOILER PRESSURE PARTS PASS 2 OF UNIT # 2 2011-2013 COMPLETED
51 2X500 MW NTPL, TUTICORIN, TAMIL NADU EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER STRUCTURE FOR UNIT # 2 2011-2013 COMPLETED
52 2X200 MW TPP, JSW STEEL, TORANAGALLU, BELLARY, KARNATAKA EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER PRESSURE PARTS (PASS-1) FOR BOILER UNIT # 2 2011-2013 COMPLETED
53 ESSAR 4X30 CPP AT PARADEEP, ODISSSA ESSAR PROJECTS,MUMBAI ERECTION,TESTING & COMMISSIONING OF TWO UNITS OF ENTIRE ESP & BTG 2011-2013 COMPLETED
54 NLC THERMAL STATION - 1, NEYVELI, TN ENGENIOUS ERECTORS P LTS, CHENNAI MAJOUR OVERHAULING OF LMZ TURBINE & ELECTROSILA GENERATOR 3X100 MW 2012 COMPLETED
55 NLC THERMAL STATION - 1, NEYVELI, TN ENGENIOUS ERECTORS P LTS, CHENNAI MAJOUR OVERHAULING OF TURBINE & AUXILIARIES 6X50 MW 2012 COMPLETED
56 2X600 MW COAL BASED THERMAL POWER PROJECT AT TUTICORIN EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOLIER PRESSURE PARTS PASS-I&II FOR UNIT-1 OF CEPL 2011-2012 COMPLETED
57 2X600 MW MAHAN THERMAL POWER PROJECT AT BANDHORA, MP ESSAR PROJECTS,MUMBAI ERECTION OF HP PIPING / LP PIPING AND VALUE ERECTION OF BOILER UNIT-1 FOR 2X600 MW 2011-2012 COMPLETED
58 2 X 500 MW,:NTPC, SIMHADRI, PARWADA, ANDHRA PRADESH EDAC ENGINEERING LTD, CHENNAI ERECTION OF CRITICAL PIPING & STG PIPING OF 2 X 500 MW BOILER 2011-2012 COMPLETED
59 2 X 275 TPH BOILER,BHUSHAN STEEL LIMITED, ANGUL, ODISHA MANISH INDUSTRIES LIMITED ERECTION,TESTING & COMMISSIONING OF 2 X 275 TPH BOILER 2011-2012 COMPLETED
60 3 X 155 TPH BOILER, HINDALCO INDUSTRIES, HIRAKUD, SAMBALPUR, ODISHA DECPL – THYSSEN KRUPP LIMITED ERECTION,TESTING & COMMISSIONING OF BOILER OF 3 X 155 TPH BOILER 2010-2012 COMPLETED
61 5 X 660 MW BOILER,ADANI POWER LIMITED, MUNDRA, GUJARAT L & T ECC DIVISION,MUMBAI PRESSURE PARTS ERECTION, TESTING AND COMMISSIONING OF 5 x 660 MW BOILER 2010-2011 COMPLETED
62 2 X 150 MW BOILER,SIMHAVARAM ENERGY, CHIKKURUR, GUDUR, A.P MEENAKSHI ENERGY LIMITED ERECTION,TESTING & COMMISSIONING OF BOILER OF 2 X 150 MW BOILER 2010-2011 COMPLETED
63 4X300 MW JSWEVL, BELLARY, KARNATAKA EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER DUCTING WORK FOR BOILER UNIT # 1 2009-2011 COMPLETED
64 4X300 MW JSWEVL, BELLARY, KARNATAKA EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER CRITICAL PIPING FOR BOILER UNIT # 1 2009-2011 COMPLETED
65 4X300 MW JSW ENERGY (RATNAGIRI) LTD,JAIGAD, MAHARASHTRA EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER PRESSURE PARTS (PASS-1) BOILER UNIT # 4 2009-2010 COMPLETED
66 2X300 MW THERMAL PROJECT, TORANAGALLU,BELLARY, KARNATAKA EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER PRESSURE PARTS (PASS-1) FOR BOILER UNIT # 1 2009-2010 COMPLETED
67 2X300 MW THERMAL PROJECT, TORANAGALLU,BELLARY, KARNATAKA EDAC ENGINEERING LTD, CHENNAI ERECTION OF BOILER CRITICAL PIPING FOR BOILER UNIT # 1 2009-2011 COMPLETED
68 2X250 MW TS-II EXPANSION PROJECT, NEYVELI, TN EDAC ENGINEERING LTD, CHENNAI ERECTION OF CYCLONE & AIR/FLUE GAS SYSTEMS DUCTING FOR BOILER UNIT# 1 2008-2010 COMPLETED
69 2 X 250 MW,UPEB, KASIMPUR, ALIGARH, UTTAR PRADESH SUNIL HI-TECH LTD,NAGPUR ERECTION,TESTING & COMMISSIONING OF 2 X 250 MW BOILER 2009-2010 COMPLETED
70 BIGWAN, SOLAPUR, MAHARASHTRA IJT INDIA PROJECT LIMITED ERECTION,TESTING & COMMISSIONING OF 1 X 120 TPH BOILER 2008-2009 COMPLETED
71 4 X 210 TPH BOILER, BHUSHAN STEEL & POWER LIMITED, JHARSUGUDA, ODISHA IJT INDIA PROJECT LIMITED ERECTION,TESTING & COMMISSIONING OF 4 X 210 TPH BOILER 2007-2008 COMPLETED
72 9 X 135 MW,: VEDANTA ALUMINA, JHARSUGUDA, ODISHA SEPCO –III,SPICJEL ENGG.CONSTRUCTION ERECTION,TESTING & COMMISSIONING OF BOILER 2007-2008 COMPLETED
73 3 X 155 TPH BOILER,HINDALCO INDUSTRIES, HIRAKUD, SAMPALPUR, ODISHA DECPL – THYSSEN KRUPP LTD ERECTION,TESTING & COMMISSIONING OF 3 X 155 TPH BOILER 2007-2008 COMPLETED
74 1 X 660MW,STPP, SIPAT, BILASPUR, CHATTISGARH DOOSAN – L&T ECC DIVISION PRESSURE PARTS ERECTION, TESTING AND COMMISSIONING OF 1 x 660 MW BOILER 2006-2007 COMPLETED
75 1 X 300 MW,WBPDCL-SAGARDIGHI, MURSHIDABAD, WEST BENGAL DONG FANG - TATA PROJECTS LIMITED PRESSURE PARTS ERECTION, TESTING AND COMMISSIONING OF 1 x 300 MW BOILER 2006-2007 COMPLETED
76 2 X 300 MW,BALCO-KORBA, CHATTISGARH SEPCO-I, SPICJEL ENGG.CONSTRUCTION, ERECTION, TESTING AND COMMISSIONING OF 2 x 300 MW BOILER 2005-2006 COMPLETED
77 3 X 155 TPH BOILER,HINDALCO INDUSTRIES, HIRAKUD, SAMPALPUR, ODISHA SPICJEL THROUGH MANISH INDUSTRIES LIMITED ERECTION,TESTING & COMMISSIONING OF 3 X 155 TPH BOILER 2003-2005 COMPLETED
78 2 X 210 MW TPS-1 EXPANSION ,NLC ,NEYVELI ANSALDO -TATA PROJECT THROUGH SUJI ENTERPRISES ERECTION ,TESTING & COMISSIONING OF BOILER 2000-2003 COMPLETED
79 3 X 100 MW TPS-1 ,NLC ,NEYVELI ABB THROUGH EEPL LEP WORK ( REVAMPING) UNIT # 7B,8B & 9A 1996-1998 COMPLETED
80 6 X 50 MW TPS-1 ,NLC ,NEYVELI BHEL THROUGH SUJI ENTERPRISES LEP WORK ( REVAMPING) UNIT # 2,3 & 4 1994-1996 COMPLETED

Click To View & Download Matarbari 2x600MW Project @Bangladesh